Homer Electric Association, Inc.
Click here to return home
About the Cooperative
Member Services
Construction and maintenance
Current News
Member Survey Results
Automated Meter Reading
2008 Annual Meeting
Kilowatt Courier
Kilowatt Courier Archive
Healy Clean Coal Plant
Northern Dynasty Joint Initiative
Press Releases

Current Electric Rates
Touchstone Energy
2006 Reclearing Project
Bradley Lake Hydroelectric Project
Youth Rally
Report Power Outages
Career Opportunities
Community Programs
Other Links
Contact Us
Bradley Lake Hydroelectric Project

Thirty-five years ago, a popular bumper sticker around Homer and the Kenai Peninsula proclaimed a simple message, “Build Bradley Lake Now”.  The original proponents of the hydroelectric project recognized the significant potential that the glacier fed lake, located 27 miles from Homer, had for providing electricity to the residents of southcentral Alaska.  Bradley Lake supporters worked for many years to convince the state of Alaska and the U.S. Army Corps of Engineers that building a hydroelectric project was a cost-effective venture that would provide decades of reliable and affordable power to Alaskans.

The dream turned into a reality in 1986 when construction on the $328 million hydroelectric plant was started. Five years later, in September 1991, the plant was energized and began transmitting electricity to residents from Homer north to Fairbanks.

Today, Bradley Lake is the largest of seven hydroelectric facilities in the state, with a capacity of 120 megawatts. Since 1991, the project has delivered an annual average of 381 million kilowatt hours of electricity to customers.  This hydro power is a clean, affordable alternative to the fossil fuels that are used to generate the majority of electricity in Alaska.

Ownership/Operation
The state of Alaska was the primary funding source for the $328 million project and is the owner of the hydroelectric facility.  Six electric utilities, including Homer Electric, participated in the funding and are each allocated a share of the power generated by Bradley Lake. Homer Electric Association’s share of Bradley Lake power is approximately 14 megawatts.

Homer Electric Association has a contract the state of Alaska to operate and maintain the Bradley Lake facility.  Under the terms of this contract, Homer Electric employees are responsible for the overall operation of the state’s largest hydroelectric facility that serves over 70 percent of the state’s population. 

Facility
The project includes a 610-foot long, 125-foot high concrete-faced and rock-filled gravity dam at Bradley Lake.  A 3.5-mile power tunnel, with a diameter of 13 feet, transports water from the dam to the power house.  The power house contains two generators, each capable of producing 60 megawatts. There is room for a third generator should one be required in the future.     

Transmission
The power generated at Bradley Lake is carried to customers via two parallel 115 kilovolt lines that extend 20 miles across Fox River valley to Bradley Junction where the lines  connect with the Fritz Creek – Soldotna transmission line.  Through interconnection with the existing transmission system, Bradley Lake power is moved through the Railbelt area and north to Fairbanks.

Benefits
Hydroelectric power is the cheapest, cleanest, most flexible source of electricity available.  The power generated at Bradley Lake averages about four cents per kilowatt hour, a significant savings over the cost of fossil fuel sources.  This environmentally clean power source provides a renewable resource that can be used by future generations of Alaskans.

Homer Office: (907)235-8551
Corporate Office:
3977 Lake Street, Homer AK 99603
Kenai  Office: (907)283-5831
Central Peninsula Service Center:
280 Airport Way, Kenai AK 99611

In Alaska call toll-free: (800) 478-8551

About the cooperative | Member Services | Construction and Maintenance | Current News
Reporting Power Outages | Career Opportunities | Community Programs | Other Links

© Copyright 2006, Homer Electric Association, All Rights Reserved