Electric Service Requirements

The following information has been designed to assist members, architects, engineers, and electrical contractors in planning for, or obtaining electric service to new or remodeled installations.

Please select the following Electric Service Requirement links to view the individual drawings for your electric service needed:

HEA Underground Trench Specifications
Consumer Clearing Requirements
Underground Clearing Requirements on Consumer Property
Overhead Clearing Requirements on Consumer Property
Developer Clearing Requirements
Customer Meter Stub (CMS) 200 AMP or Less
Customer Meter Pole (CMP) 200 AMP or Less
400 AMP Two Post CMS
Underground Meter Base Building Mounted 400 AMP or Less
Overhead Meter Base Building Mounted 200 AMP or Less
Overhead Meter Base Gable Mounted 200 AMP or Less
Underground Service (6 Units or Less)
Underground Service (More than 6 Units)
Single Phase 400 to 800 AMP
Three Phase 400 to 600 AMP
Three Phase Underground Service 800 to 2000 AMP

Click the following link to review the complete 2018 Electric Service Requirements Service Assembly Guide